Two Highside field hands at a drilling rig at dusk, one pointing toward a pumpjack.
Section 02 / 05
Company / About

Independent
by design.

Highside was built to own the whole problem — the rock, the rig, and the lease. Seventeen years on the Texas Gulf Coast, and the operating model has not changed.

2009Founded
1,240Wells online
14Texas counties
HoustonHeadquarters
Est. 2009 Houston, Texas 1,240 wells / 14 counties

A field company first.

Highside started in Wharton County with a small set of stripper wells and a supervisor who knew every valve on the route. The company grew by buying fields other operators had stopped paying attention to — and then paying attention.

Today we operate 1,240 wells across 14 Texas counties from an office in Houston Heights. The scale is larger. The logic is the same: keep the subsurface, the rig, and the lease under one roof, and put the people who plan the work on the lease where it happens.

We are deliberately private and deliberately concentrated. We would rather be the best operator in four core counties than a minor participant in forty.

1,240Wells online
68,400Gross acres
96%Operated production
0.00TRIR / 12 months
Highside Oil and Gas, LLC logo
The mark

Drawn from the derrick floor.

The Highside mark is built from the same three lines as a mast: structure, load, and the angle that keeps it standing. The wordmark is set in a heavy italic — closer to stenciled equipment than a corporate signature.

Highside Oil and Gas, LLC
Houston, Texas
History 2009 — 2026

Seventeen years
of the same idea.

No pivots, no platforms, no new logos for new strategies. We bought wells, fixed them, and kept them online.

  1. 2009

    Founded in Wharton County

    Highside takes over its first 46 stripper wells and a field route that still runs today.

  2. 2012

    First operated field

    The company hires its first full-time field supervisors and brings compression and saltwater disposal in-house.

  3. 2016

    500 wells

    Expansion into Jackson and Matagorda counties, with the first multi-well pad drilled on the Gulf Coast leasehold.

  4. 2019

    Houston headquarters

    Land, engineering, and accounting consolidate in Houston Heights. Field offices stay in the counties.

  5. 2023

    1,000 wells online

    Brazoria County added as a fourth core area. The operating standard is written down for the first time.

  6. 2026

    1,240 wells / 18-well program

    Six rigs running the Wharton County development, with first production scheduled for Q4.

How we work Four rules / No exceptions

The operating
standard.

These are not values on a wall. They are the reasons a well gets shut in, a contractor gets removed, or a deal does not close.

01 / Ownership

Name the owner.

Every well, battery, and project has one accountable person. If two names are on it, nobody owns it.

02 / Safety

Stop the job.

Anyone on a Highside lease can stop work without asking. The field supervisor's job is to back that call.

03 / Detail

Fix the small thing.

A leaking packing gland is a data point, not a nuisance. Small failures are how wells go offline for a month.

04 / Patience

Operate for year ten.

We size equipment and staff for the long run, not for the quarter the deal closes.

Read the people behind it.

The team is small by design. The people who make the calls are the people you will meet.